UTUtah
Utah Lien Deadlines for Material Suppliers
Utah suppliers must track their preliminary notice and the original contract's final completion. A notice of completion can shorten the recording period, and owner-occupied residence rules can affect whether a lien is available.
Public date calculations cover Florida and Kansas. Utah dates require qualified review.
Risk context
Utah is High Risk for Suppliers
Your last delivery does not establish the original contract's final completion. Identify the applicable completion event and check the State Construction Registry for a notice of completion before relying on a recording date. These rules concern private construction projects and material suppliers; claimant status, multiple original contracts, and owner-builder arrangements need separate review.
Deadline schedule
Utah Mechanics Lien Deadlines (Updated 2026)
Scroll sideways to see all deadline details.
| Deadline Type | Timing | Details |
|---|---|---|
| Preliminary Notice | File in the State Construction Registry within 20 days after first furnishing | Required for the ordinary supplier route, including suppliers contracting directly with the owner. Late filing has limited prospective effect. |
| Lien Filing Deadline | 180 days after final completion of the original contract; if a qualifying notice of completion is filed, the earlier of that limit and 90 days after the notice filing | Record with each applicable county recorder. A supplier's final delivery is not a substitute for statutory final completion. |
| Enforcement Deadline | Generally 180 days after filing the lien | File the enforcement action and record the notice of its pendency within the applicable period. Bankruptcy and residence-specific requirements need review. |
| Statutes | Governing statutes | Utah Code §38-1a-501, §38-1a-502, §38-1a-701 |
Track these steps separately:
- Establish completion. Section 38-1a-102(17) uses a permanent certificate of occupancy, required final inspection, or another specified completion or termination event, depending on the project. Do not guess this date from an invoice.
- Check the completion notice. A section 38-1a-507 notice can shorten the recording period. A special rule may apply to statutory subcontractors doing substantial work after occupancy approval or required final inspection; repair and warranty work are excluded from substantial work.
- Check residence eligibility. For an owner-occupied residence, an indirect supplier can be barred where the general contract is no more than $5,000, or where the owner meets the written-contract and full-payment conditions. Those restrictions do not apply merely because a project is labeled residential, and the cited indirect-supplier bar does not cover an agreement directly with the owner. See §38-11-107 and §38-11-204(4)(a)–(b).
Supplier pitfalls
Common Supplier Mistakes in Utah
Missing the 20-day Preliminary Notice
A late registry notice may protect construction work beginning five days after filing; it does not recover earlier deliveries. A preliminary notice filed more than ten days after a qualifying notice of completion has no effect. Failing to file the required notice prevents a construction lien. Check the actual filings before treating a late notice as effective.
Using one 90-day period for every project
Without a qualifying notice of completion, the ordinary limit is 180 days after original-contract final completion. With one, compare both limits. Utah Code §68-3-7 moves a last day falling on a Saturday, Sunday, or legal holiday to the next qualifying day; verify the holiday law applicable to that date.
Overlooking an intent-to-complete notice
Certain large, unbonded nonresidential projects require a notice of intent to obtain final completion. For a supplier covered by §38-1a-506(3), that filing requires an amendment to the preliminary notice within 20 days. It is a separate registry step from recording the lien.
Missing the 180-day enforcement deadline
Recording does not complete enforcement. Section 38-1a-701 also requires a timely action and notice of pendency, and adds requirements for actions involving a residence.
Deadline calculator
Not Sure Which Deadline Applies?
Use this Utah guide and collect your project facts for qualified review.
Review Utah project factsThe public calculator provides dates only for reviewed Florida and Kansas scenarios; it does not calculate a Utah date.
Common questions
Frequently Asked Questions
Does Utah always give a supplier 90 days to record a lien?
No. The ordinary period is 180 days after final completion of the original contract. If a qualifying notice of completion is filed, recording must occur within 90 days after that filing and no later than the 180-day limit. Special post-occupancy work needs separate review.
Can a late Utah preliminary notice protect any deliveries?
Potentially. Section 38-1a-501 excludes work before the date five days after the late filing. A notice filed more than ten days after the project's notice of completion has no effect, so both registry dates matter.
Is supplying an owner-occupied residence enough to establish lien rights?
No. Identify who hired you, the general-contract amount, the owner's qualifying written contract, and full-payment facts. The restrictions in section 38-11-107 can bar an indirect supplier even when its notice and recording dates are timely.
Important note